Carrie's and Andy's Home
March 6, 2002 Ready for shingles.  Lofty ceilings and wide-open spaces. Second floor.
 Second floor.  Great room. Time to clean up at the end of the day. He does floors, but not windows.
March 17, 2002 Shingles on, garage floor poured.  Installation of ductwork has begun.  Kitchen.  Rough plumbing in place. April 4, 2002 Checking it out.  Home inspection in process.  Kitchen doesn't look much different, but rough electrical is done.  The latest in see-through interior design - no walls to block the view. April 15, 2002 A lot is going on. Siding is being installed; forms are being built for the front walk; and topsoil is being placed and graded.  The drywall's hung and taped. Now there are real rooms!  The great room is a sea of new drywall. May 4, 2002 The driveway is done, and the exterior is nearly complete except for sod and landscaping.  The walls are painted, electrical is finished and most of the trim has been installed.  The kitchen's taking shape - ready for floor covering and appliances.  The great room from the dining area - almost ready for carpet.  The front entry.
|
|
|
|
Home Advice
Get the answers on home selling and buying.
|
|
|
|